USF Libraries
USF Digital Collections

Implementation of low impact development in modern urbanization as exampled through capstone design

MISSING IMAGE

Material Information

Title:
Implementation of low impact development in modern urbanization as exampled through capstone design
Added title page title:
Final engineering details Osprey Village development project
Physical Description:
1 online resource (3, 28 p.) : ill. ;
Language:
English
Creator:
Risner, Allyson G
Publisher:
University of South Florida Libraries
Place of Publication:
Tampa, Fla
Publication Date:

Subjects

Subjects / Keywords:
Mixed-use developments -- Florida   ( lcsh )
Sustainable urban development -- Florida   ( lcsh )
Genre:
bibliography   ( marcgt )
non-fiction   ( marcgt )

Notes

Thesis:
Thesis (Honors)--University of South Florida, 2009.
Bibliography:
Includes bibliographical references (p. 2-3 of first group).
General Note:
Title from cover.
General Note:
"Semester completed: spring 2009."
General Note:
"This thesis is a continuation of my Engineering Capstone Design. ... The initial design was completed as a group (consisting of five people) under the fabricated engineering firm Lever Engineering, LLC and was completed as if it would be submitted to the County for actual approval"--Abstract.
General Note:
A winning thesis in the Grace Allen Honors College/Library Scholar program.
Statement of Responsibility:
Allyson G. Risner.

Record Information

Source Institution:
University of South Florida Library
Holding Location:
University of South Florida
Rights Management:
All applicable rights reserved by the source institution and holding location.
Resource Identifier:
aleph - 002045311
oclc - 489769126
usfldc doi - G33-00005
usfldc handle - g33.5
Classification:
System ID:
SFS0000032:00001


This item has the following downloads:


Full Text

PAGE 1

Implementation of Low Impact Development in Modern Urbanization as Exampled Through Capstone Design Honors Thesis: IDH 5975 Author: Allyson G. Risner U 80175725 University of South Florida Honors College Mentor: Dr. Mark A. Ross, PhD, PE University of South Florida Department of Civil and Environmental Engineering Semester Completed: Spring 2009

PAGE 2

Abstract This thesis is a continuation of my Engineering Capstone Design. The design itself involves the site plan of a fictitious mixe d use development in Polk County, Florida. The initial design was completed as a group (consisting of five people) under the fabricated engineering firm Lever Engineering, LLC and was completed as if it would be submitted to the County for actual approval The project was designed over a 20 acre site ( with an additional 10 acres available for purchase ) in Winter Haven, Florida that is currently being used as a neighborhood park with several youth baseball fields. Lever Engineering was given specific desi gn requirements for the site that were deemed necessary to serve the area's growing population. In the development, it was requested that the campus include a YMCA with an outdoor pool and children's athletic field, an elderly assisted living facility, mu lti family housing, a child care facility with adequate play area, a library and cultural center, a public health clinic, a passive recreational park complete with forested area and picnic shelter, and a paved walking trail throughout the development. The plans must also include adequate parking, utility layout and design, roadway planning, and a complete stormwater management plan. It was also asked that the development be an integrated site plan with the various components organized and situated in a lo gical and aesthetic manner, while providing preservation of existing trees and other amenities where practical. Using the design developed, I have made recommendations to the "County" to develop this new neighborhood utilizing Low Impact Development (LID ) technologies and practices. The LID proposal focuses on mimicking the natural hydrologic cycle of the area in an attempt to reduce environmental impact of development. Means of implementation include Bioretention swales, pervious pavements, and the str ategized use of canopy trees. Each of these elements help stormwater to permeate into the soil as it normally would without development and reduce runoff. The enclosed engineering report completed by Lever Engineering includes the feasibility research of the above project, the site plan (including structural layout, utilities, roadway and parking design, grading details, and a n integrated stormwater management plan), required permits, and a cost estimate. Also included within the report are reasons, mea ns, estimated additional cost, and application of incorporating the recommended Low Impact Development technologies into the site.

PAGE 3

Resources Colley, Barbara C. Practical Manual of Land Development. New York: McGraw Hill, 1999. Kibert, Charles J. Sustainable Contruction: Green Building Design and Delivery (2nd Edition). John Wiley and Sons, Inc., 2008. Leiserowitz, Anthony and Kenneth Broad. "Florida: Public Opinion on Climate Change." May 2008. 5 April 2009 . Low Impact Develoment Center, Inc. "Drainage Bioretention Specification." 2003. 30 March 2009 . Low Impact Development Center, Inc. (LID Center). Low Impact Development Center, Inc. 18 December 2008. 12 February 2009 . Low Impact Development Center, Inc. Rain Garden Design Templates. 2007. 2 April 2009 . Pennsylvania Department of Environmental Protection. "Pennsylvania Stormwater Best Management Practices Manual: Section 6 Comprehensive Stormwater Management: Structural BMPs." Pennsylvania: http://www.dep.state.pa.us/dep/subject/ad vcoun/stormwater/Manual_DraftJan05/Section0 6 StructuralBMPs part1.pdf, January 2005. Polk County Planning Division. Polk County Land Development Code: Article III. 1 September 2000. Polk County Utilities. "Technical Standards and Specifications Manual fo r Utility System Design, Construction, and Testing." Polk County, Florida, 2009. Prince Geroge's County, Maryland Department of Environmental Resources: Programs and Planning Division. "Low Impact Development Design Strategies: An Integrated Design Appr oach." June 1999. 30 March 2009 . Ross, Dr. Mark. "Request for Proposal: Fictitious Multi Use Neighborhood Project, Engineering Design Competition." USF Capstone: Spring 2009. 12 January 2 009. United States Environmental Protection Agency (USEPA). Polluted Runoff (Nonpoint Source Pollution). 15 January 2009. 12 February 2009 .

PAGE 4

United States Green Building Council (USGBC). LEED for Neighborhood Development. 2008. 21 February 2009 . USGBC: LEED. 2008. 9 February 2009 . Acknowledgements I would like to thank those who assisted me in both the research and the design process involved in creating this thesis. The contributions made by these individuals helped make this report a success. Capstone Group: Tyler McDougal Tracy Dayton Zachary Gross Patrick Beck Committee Members: Dr. Mark Ross Jennifer Perone Capstone Director: Mr. George Wise

PAGE 5

! ! ! ! ! ! ! ! ! ! 2009 ! L EVER E NGINEERING, LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH A remark of Archimedes quoted by Pappus of Alexandria "#$%&'!()**+,&!-&.&*/$0&12!3%/4&52 !"#$%&&'()*+, ) "#$%!&#'()*+!,! &./!012!341%!5#6 6+!"70+!"8 9(:;<16:)*!#=!>#')7!,$#1:?4 0<@41)A<()!#=!&:;:$!4(?!8(;:1#(A<()4$!8(B:(<<1:(B CDED!846)!,#F$<1!G;<('<+!8HI!JJK L4A@4+!,-!MMNDE O PMPE ! -.)/'01+.0')*+, ) ,:Q):):#'6!3'$): O 96
PAGE 6

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 2 of 28 Executive Summary In order to serve the growing need for social services Polk County (COUNTY) is developing a new multi functional community (Osprey Village). The COUNTY has designated a 20.28 acre tract of land for Osprey Village. This land is l ocated at 50 Coleman Rd. Winter Haven FL 33880. This property is currently used as a public park and recreation area that contains four little league baseball fields, three racquetball courts, a basketball court, a concession stand, and other ancillary su pport structures. The COUNTY also provided the developer with the option of acquiring an additional 10 acre tract of land that lies due east of the 20 acre tract of land. Due to the cost of acquiring the additional 10 acre tract of land, Lever Engineerin g has designed Osprey Village in an aesthetically pleasing and efficient manner utilizing only the 20 acre tract of land. The COUNTY has designated that Osprey Village contain the components shown in Table 1 and that each component be designed to meet the constraints shown below as well as minimize the impact on surrounding property Component Area(ft 2 ) Units Constraints YMCA 10,000 Pool 5,000 Athletic Field Multi Family Housing 80 2 Story Max. Assisted Living Facility 120 3 Story Max. Child Care Facility 10,000 Library & Cultural Center 20,000 Public Health Clinic 14,000 Passive Recreation Area Pavilion 4,000 Walking Trail Table 1: Development Requir ements In order to develop the site it is necessary for the COUNTY to rezone the property from a designation of Recreation Open Space (ROS) to a designation of Residential Medium (RM). Lever Engineering has planned Osprey Village as a Residentially Based Mixed Development (RBMD) and using innovative design practices achieved the necessary points required by the Polk County Land Development Code Book to raise the Residential Gross Density allowances to the level required by Osprey Village.

PAGE 7

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 3 of 28 In order to manage the increased stormwater flow created by buildings, roadways, and other impervious surfaces throughout the development, Lever Engineering has designed a 3.83 acre wet detention pond to be located in the eastern section of the property. The increase d stormwater flow is routed from buildings, roadways, and parking lots to this pond via a reinforced concrete pipe system ranging in size from 18 42 inches. Lever Engineering feels that this pond will not only provide adequate stormwater management, but will also create an aesthetically pleasing accent for both residents and visitors of Osprey Village. To provide potable water to the site, Osprey Village will connect to the existing water main along Coleman Road's right of way. The potable water system is designed to provide adequate water pressure and fire flow to all components within the development. The plans include four fire hydrants and pipes are blue Polyvinyl Chloride (PVC) ranging in size from 1 8 inches. The gravity sanitary sewer system on site discharges to a pump station located in the southwest quadrant of the property which conveys the flow to the existing 8 inch force main at the southwest corner of the site. The gravity sewer consists of green PVC pipe with an 8 inch collector and 6 inch leads. The total cost for development of Osprey Village is estimated to be $2,400,000. A detailed estimate is included in Appendix F. In addition, Lever Engineering has included recommendations for the development of Osprey Village in an attempt to lessen the environmental impact on the property. These recommendations are intended to follow suit with common Low Impact Development practices. Means of suggested implementation are included within the report and details are included within Appendix H. Also included is a detailed estimate of additional cost associated with the proposed LID technologies, which has been calculated to be approximately $300,000. This document includes Lever Engineering's specifications and site plans for each of the afo rementioned components. These elements are intended to fully inform Polk County of the design details and of all visual and technical aspects of the project as proposed by Lever Engineering, LLC.

PAGE 8

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 4 of 28 Table of Contents 1.0 Project Overview . 7 1.1 General Site Information. 7 1.1.1 Site Description 1.1.2 Existing Use of Property 1.1.3 Easements 1.2 Zon ing..8 1.2.1 Current Zoning 1.2.2 Surrounding Parcels 1.2.3 Zoning Recom mendation 1.3 Site Access and Constraints.9 1.4 Endangered or Pro tected Species.9 2.0 Proposed Building Specifications 9 2.1 Multi Family Housing S pecifications. 9 2.2 YMCA Specifica tio ns.. 11 2.3 Child Care Facility S pecifications... 11 2.4 Health Clinic Specifications .... 11 2.5 Library and Cultural Center Specifications. 11 2.6 Recreation and Picnic Are a Specifications 12 2.7 Assisted Living Facility Specifications... . 12 3 .0 Demolition Plan .. . 13 4.0 Site Paving Plan. .. 13 4.1 Pavement Spe cifications.. 13 4.2 Roadwa y Design .. 1 4 4.3 Parking Lot Spe cifications... 14 4.4 Parking Lot Design.. 1 4 4.5 Pedestrian Trail /Sidewalk Design 14 5 0 S ite Grading Plan . 1 5 5 .1 Existing Topo graphy 15 5.2 Grading Plan with Propo sed Topography 15 6 .0 Existing Soil Con ditions.. 1 6 6 .1 Surface Soil Cond itions....... 1 7 6 .2 Sub Surface Soil Conditions.... 1 7

PAGE 9

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 5 of 28 T able of Contents (cont'd.) 7 .0 Stormwater / Drainage Plan 1 7 7 .1 Rainfall Depths . 1 8 7 .2 Rainfall Distribution 1 8 7 .3 Design Requi rements 1 8 7.4 Water Quantity 18 7.5 Water Quality 18 7 6 Pre Dev elopment Drainage Conditions 1 9 7 7 Post Dev elopment D rainage Conditions. 1 9 8 .0 Utilities .. .. 20 8 .1 Utility Service Availabili ty .. ........ 20 8 .2 Utility Providers .. 21 9 .0 Sanitary Sewer Plan.... . 21 9.1 Lift Stati on Design 22 1 0 .0 Water Supp ly Plan. 2 2 1 1 .0 Permitting Req uirements. . . 2 3 1 1 .1 Environmental Res ource Permitting (ERP). . 23 1 1 .2 National Pollutant Discharg e Elimination System (NPDES) 23 1 1 3 Stormwater Pollution Prevention Plan 23 11.4 Potable Water and Sanita ry Sewer Connections... 24 11.5 Sanitary Sewer System.. 24 11.6 Migratory Bird Nest Removal... 24 11.7 Permitting Contact Information 24 1 2 .0 Cost Analysis . 25 13.0 Low I mpact De velopment.25 13.1 Benefits of Low Im pact Development..25 13.2 Bioretention and Rain Gardens. 26 13.3 Pervious Pavement 27 13.4 Canop y Trees.27 13.5 A dditional Cost Analysis 28

PAGE 10

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 6 of 28 Appendices Appendix A General Site Information Site Maps Property Appraiser Records and Zoning Information Selections from the Geotechnical and Soils Reports Appendix B Drainage Details ( Pre and Post Development) SWFWMD ERP Rainfall Maps Drainage Maps Pond Attenuation and Sizing Calculations ICPR Drainage Analysis Storm Sewer Hydraulics Details and Sizing Pond and Drainage Technical Drawings Appendix C Sanitary Sewer De tails Appendix D Potable Water System Details Appendix E Permits ERP Application NOI of Stormwater Construction NOI of Water Main Construction for Potable Water Systems Application for the Permitting of Water, Sewer, and Reuse Water Ap plication for Constructing a Wastewater Collection System Migratory Bird Nest Removal Permit Application Appendix F Cost Estimate Appendix G Plan Details and Drawings Appendix H Low Impact Development Pervious Pavement Details Polk County Recommended Species List Additional Cost Estimate Appendix I References and Acknowledgements

PAGE 11

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 7 of 28 1.0 Project Overview The proposed project consists of a YMCA facility with outdoor pool and children's athletic field, multi family housing, elderly a ssisted living facilities, a child care facility, a library and cultural center, a public health clinic, a passive recreation area with picnic area and covered pavilion, a paved walking trail through the campus, an entrance road with interior access street s, and new parking lots with paved drive isles. A site layout map of the pro posed development is in Appendix G 1.1 General Site Information 1.1.1 Legal Site Description The proposed development is located in Section 25, Township 28S, Range 25E. The parc el ID#'s of the two main properties proposed for development are: Property 1 ID#: 252825000000024040 Property 2 ID#: 252825000000024010 Combined these two parcels cover approximately 20 acres. The property address is 50 Coleman Road, Winter Haven, F L 33880. The Polk County Property Appraiser records of the two main properties are attached in Appendix A A vicinity map of the proposed development is attached in Appendix A A site aerial map of the proposed development is attached in Appendix A 1.1.2 Existing Use of Property The property is currently a county park. The park contains four youth baseball fields, one basketball court, three racquetball courts, one concession building, bathrooms, covered picnic areas, and supporting storage a nd maintenance buildings. 1.1.3 Easements The only existing easement on property is a fifty foot perpetual roadway access easement that encompasses the entrance road into the park. This easement extends along the access road for approximately 400 f eet. Other

PAGE 12

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 8 of 28 offsite easements for drainage and utilities exist that will not require alteration. 1. 2 Zoning 1.2.1 Current Zoning Property one is currently zoned as Recreation Open Space (ROS) as shown in Current Zoning Map attached in Appendix A Th e purpose of the ROS district is to provide for the use and development of lands and areas which are accessible to the public, and which are oriented towards providing recreational activities and services for County residents and visitors. This designation severely limits the types of structures that can be built on this parcel. Properties two thru seven are currently zoned as Residential Medium (RM) as shown in Current Zoning Map (See Appendix A ). The purpose of the RM district is to provide areas for me dium density residential development within urban areas. The RM district permits single family dwelling units, duplex units, multi family units, group living facilities, and community Facilities. This designation permits the development of all proposed st ructures by Polk County for the Osprey Village Development. 1.2.2 Surrounding Parcels The surrounding parcels are residential properties. The northern border is Coleman Road with RM beyond the road Right of Way. The eastern boundary is bordered by resi dential properties zoned RM. The southern boundary is border by residential properties zoned RM. The southwestern corner is bordered by residential property zoned Residential Low 1. The western boundary is bordered by residential properties zoned RM. 1 .2.3 Zoning Recommendation Lever Engi neering recommends that Osprey V illage be constructed on only the 20 acre site and developed as a Residentially Based Mixed Use Development (RBMD). Property one should be rezoned from Recreation Open Space (ROS) to a designation of Residential Medium (RM). The County should then seek to combine properties one and two into a single parcel of land. Utilizing new and innovative engineering practices, Lever Engineering has design ed Osprey Village in a clean and efficient manner

PAGE 13

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 9 of 28 in order to achieve the necessary density points required to increase the Residential Gross Density level to the concentration required by Polk County ( See Appendix A ). 1. 3 Site Access and Constraints For the proposed site, Polk County has requ ired that access to the campus be permitted only through existing roads. An overview of the site sh ows that there is currently one public paved roadway bordering the area: Coleman Road SW. Coleman Road is a two lane public highway that runs east west alo ng the north boundary of the site and currently serves as the only access point to the park. There are no public roadways adjoining the western, southern, or eastern perimeters. 1.4 Endangered and Protected Species During inspection of the site, it was noted that two pairs of nesting ospreys currently inhabit the area. This is an estimate based on personal observation and a more involved investigation will provide the company with a more accurate account. The ospreys observed currently nest atop the fi eld lighting poles that are on site. Because these poles will need to be removed during the construction process, these nests must be safely relocated. In accord with the State of Florida Fish and Wildlife Conservation Commission, a Migratory Bird Nest R emoval Permit Application must be completed and submitted to the Division of Habitat and Species Conservation. 2 .0 Proposed Building Specifications 2. 1 Multi Family Housing Specifications The housing complex will be located in the southern portion of t he campus and will consist of five two story buildings, each with sixteen units (eight on each floor). We will incorporate two building layouts, referred to as Model A and Model B. Of the five buildings, two will be Model A and the remaining t hree will b e Model B. The complex will include such amenities as a leasin g office and clubhouse and a playground a rea. Based on the s ub contracted work of AGR Architecture, the apartment buildings for the multi family complex will have three unit options:

PAGE 14

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 10 of 28 1 Bed room: 900 ft 2 (30 x 30 ft) 2 Bedroom: 1050 ft 2 (35 x 30 ft) 3 Bedroom: 1400 ft 2 (40 x 35 ft) Below are the basic layouts for both models as provided by AGR. Please note that while Lever Engineering has taken all reasonable steps to assure the accuracy of these basic drawings, it cannot guarantee that changes or alterations will not be made by persons other than Lever Engineering, LLC. Model A: Model B: 3 Bedroom 3 Bedroom 2 Bedroom 3 Bedroom 3 Bedroom 2 Bedroom 2 Bedroom 2 Bedroom 150 ft 70 ft Stairwel l Hallway ( 5 ft) 2 Bedroom 2 Bedroom 1 Bedroom 2 Bedroom 2 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 140 ft 60 ft Stairwel l Hallway (5 ft)

PAGE 15

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 11 of 28 2.2 YMCA Specifications The YMCA will be located on the southwestern edge of the site. The County has required that the building be 10,000 ft 2 complete with a 5000 ft 2 pool and a large athletic field. The building will be two stories high, reducing its footprint to 5000 ft 2 The pool will be located on the west side of the main building and will have 15 ft of surrounding deck. The athletic field is 0.9 0 acres and is located directly south of the building and pool. 2 3 Child Care Facility Specifications The County has requested that the child care facility be 10,000 ft 2 and be accompanied with a child play area. According to the Polk County Land Development Code, the play area must have a minimum of 45 ft 2 of useable, safe, outdoor play area per child. Lever Engineering has assumed the facility will care for a maxi mum of 100 children. Based on this assumption, the play area will be 5000 ft 2 (500 ft 2 over the minimum requirement). The facility must also have a one way designated pick up loop to facilitate the flow of traffic, and cannot have direct access to a loca l residential street. The child care center will be located north of the YMCA, with a shared parking lot separating the two buildings. 2 4 Health Clinic Specifications The health clinic will be located on the north border of the campus adjacent to the m ain road. The County has required that the building be 14,000 ft 2 To preserve space, the building will be two stories and will have a footprint of 7,000 ft 2 The health clinic will share a parking lot with the library and cultural center, which will be located adjacent to the clinic. 2.5 Library and Cultural Center Specifications Per the County, the library and cultural center will be one building with a size of 20,000 total ft 2 In an effort to preserve as much land as possible, the building will be a two story building with a footprint of 10,000 ft 2 The library and cultural center will be located in the northeast corner of the campus, adjacent to the health clinic. As p r eviously mentioned, the library will share a parking lot with the health clin ic.

PAGE 16

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 12 of 28 2. 6 Recreation and Picnic Area Specifications The County has required that the campus include a small recreational area that includes a 4000 ft 2 pavilion and a picnic area. Lever Engineering will also include a small facility for restrooms and wat er fountains. This area will be located in the northern part of the site, alongside the southeastern portion of the wooded area. Lever Engineering will make every effort to minimize the environmental impact to the wooded area. 2. 7 Assisted Living Facili ty Specifications The assisted living facility will have 120 units, as specified by the County. The facility will be located just south of the retention pond and will include the following support facilities: laundry area, dining hall, large recreation r oom, administration office, and a nurse's station. Like the multi family housing, the architectural renderings of the assisted living facility were created by AGR Architecture. The building will be three stories (25,800 ft 2 footprint), housing residents o n the top two and support facilities on the first floor. Each unit will be 18 x 18 feet, giving residents 324 ft 2 Below is the basic layout for the second and third floors as provided by AGR. Two elevators are located at either end of the building an d two staircases are located in the middle. The center hallway is 8 feet wide and the supporting hallways are 7 feet wide. Please note that while Lever Engineering has taken all reasonable steps to assure the accuracy of these basic drawings, it cannot g uarantee that changes or alterations will not be made by persons other than Lever Engineering, LLC. 98 ft elev elev stair stair 263 ft

PAGE 17

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 13 of 28 3.0 Demolition Plan The existing property is currently a county park. The park contains four youth baseball fields, one basketball court, thr ee racquetball courts, one concession building, bathrooms, covered picnic areas, and supporting storage and maintenance buildings. All buildings are to be demolished as shown in the demolition plan The associated parking and access roads are to be removed including the existing swale in the northeast section of the property. The wooded area in the northwest corner of the property will be preserved along with the site perimeter fence. A total of 35 trees are to be removed and the remaining stumps are to be grinded and removed. See Appendix G for an overview of area to be demolished. The cost of clearing, grubbing, and protection of remaining objects is included in the cost analysis. 4 .0 Site Paving Plan 4 .1 Paving and Curbing Specifications All curbing on the site is concrete FDOT type D' A total of approximately linear feet of concrete type D' curbing is needed. The light duty pavement will be used in the parking areas. This pavement is composed of 1.25'' of Type S III asphaltic concrete (structura l coarse) 6'' of FDOT limerock base (LBR>100) compacted to a minimum of 98% of its maximum dry density as determined by AASHTO T 180, and 8'' of sub grade compacted to a minimum of 95% of its maximum dry density as determined by AASHTO T 180. A total of a pproximately 180,000 square feet of light duty pavement will be needed. The heavy duty pavement will be used on the spine road Osprey Court This pavement is composed of 2.0'' of Type S III asphaltic concrete (structural coarse), 8'' of FDOT limerock ba se (LBR>100) compacted to a minimum of 98% of its maximum dry density as deter mined by AASHTO T 180, and 12'' of sub grade compacted to a minimum of 95% of its maximum dry density as determined by AASHTO T 180. A total of approximately 26,400 square feet of heavy duty pavement will be needed. The cost of all paving and curbing is included in the cost analysis.

PAGE 18

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 14 of 28 4.2 Roadway Design The proposed two way private access road is anticipated to have a traffic load consisting of mostly passenger cars with occa sional delivery and service truck traffic, with occasional buses. The proposed two way private access road will be named Osprey Court. The road is 1,095 linear feet in length and 24 feet wide, with 12 foot wide lanes. It is divided by two parallel 4'' wid e yellow stripes along its entire length that are offset 4'' from the centerline of the road on each side. The road will be paved using heavy duty pavement type (See Section 3.0 for details of heavy duty pavement). Osprey Court is designed to have a crown at the center with a 2% typical slope toward the FDOT type D' curbs in order to convey stormwater to the curb inlets. The longitudinal road slope is 1%. Proper signage will be placed alongside Osprey Court to ensure driver safety. A speed limit of 30 mph will be implemented and enforced for Osprey Court. 4.3 Parking Requirements The parking requirements for each component will be in accordance with the conditions specified in Table 7.10 of the Land Development Code for Polk County The site w ill require approximately a total of 500 spaces The spaces will all be dimensioned as specified in Chapter 7, Section 708. Each parking lot will have landscaping that meets the requirements in Chapter 7, Section 720 of the Land Development Code for Polk County. 4 .4 Parking Lot Design Four parking lots have been design to meet the above stated requirements. The locations of the lots are shown in the site plan A total of 527 spaces are provided in the design, 21 of which are handicapped spaces. The total area covered by the parking lots is 4.08 acres. Light duty pavement will be used for all parking lots; therefore 4.08 acres of light duty pavement will be required for construction. 4.5 Recreational Trail / Sidewalk Design A recreational walking/cycling tra il has been designed to meet pedestrian travel needs for both visitors and residents. The trail runs throughout the site providing safe access to all buildings and parking lots as shown in the site plan The width of the trail varies between six and seven feet and has an overall length of 5,065

PAGE 19

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 15 of 28 feet. Light duty pavement will be used for a majority of the trail, with heavy duty pavement proposed for road crossings. Adequate signage and trail striping will be provided for road crossings and areas with limit ed site distances. 5 .0 Site Grading Plan 5 .1 Existing Topography Based on survey data and on site contours, the topography is very flat, especially in the southern quadrant, having more moderate slopes in the northern quadrant ( Appendix A ). The hig h point elevation is 154 feet NAVD, and is found in the center of the site. The low point elevation is 149 feet NAVD in the northern reaches of the site. Most of the vegetation is thick wooded area in the northeastern quadrant as well as along Coleman R oad. The only on site access road is Polk Park Road to provide access to the courts and baseball fields. The site is located outside of the 100 year and 500 year floodplains in Flood Zone X, according to FEMA FERM Panel 12105C0345F Panel 345 of 1045 (E ffective Date: December, 200). Therefore no floodplain compensation is needed (See Appendix A ). 5 .2 Grading Plan with Proposed Topography The attached grading plans are broken down into three sections to better show the details and points. These se ctions are A, B, C which correlate to the south third, middle third and north third of the site respectively. The site is graded so that the edge of the property matches the existing grades of the neighboring properties. The southern half of the site's boundary has conve yance swale running along it to take the stormwater runoff from the offsite contributing areas and convey it to the pond. The swale discharges into three separate FDOT type C ditch bottom inlets. The ditch is a V' swale meaning that it has a constant slope on the sides with a point at the bottom. The si de slopes have a grade of 1:4. The bottom of the swale has a slope of 0.5% to convey the water to the inlets. The parking areas are graded to allow the stormwater to flow into F DOT type D inlets which are typically in the middle of the each parking area. The inlet rim elevations are typically set to 152.00 which is above the hydraulic grade line for

PAGE 20

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 16 of 28 the 100 year 24 hour storm event. This will keep water from pooling in the parking lots during the different storm events. The slope of the pavement is typically between 0.5% and 2.0%. These slopes will allow the conveyance of the stormwater while keeping the slope moderate enough to adhere to the ADA rules for handicapped park ing. The spine road Osprey Court is graded to match the existing grades of the entrance from Coleman Road. The road is graded to convey stormwater into FDOT type D curb inlets along different points on the road. The inlets are typically set to an el evation of 152.00 which is above the hydraulic grade line of the 100 year 24 hour storm event. The road is crowned in the middle with a slope of 2% down to the curbing. The longitudinal slope of the road is 1%. The stormwater will flow along the FDOT t y pe D' curb ing to the nearest curb inlet. The sidewalks in the site are set to a maximum of a 2% cross slope with a maximum of 4% longitudinal slope. This ensures that the sidewalks comply with the ADA rules for sidewalks. Where the sidewalks enter a ro adway curb ramps have been placed with a maximum cross slope of 2% and a maximum grade of 1:12. When a sidewalk borders a parking area the sidewalk elevation is set 6" above the pavement surface. The building finish floor elevations are set at or above 1 53.50' which is more than 1 foot above the 100 year 24 hour storm event water level. This ensures that the buildings will not flood during a 100 year 24 hour event. The pond is sloped at a grade of 1':4 '. 6 .0 Existing Soil Conditions Existing soil cond itions and geotechnical information are revealed through the services of the NRCS with the Custom Soil Resource Report for Polk County FL as well as the services of Nodarse & Associates, Inc with a geotechnical report of our area of interest. Based on the soil survey and geotechnical tests we were able to obtain valuable information regarding soil types, properties and characteristics as well as information regarding the water table.

PAGE 21

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 17 of 28 6 .1 Surface Soil Conditions The project site contains sandy soil th roughout the 20 acres with pomello fine sand in the southwest and northern quadrants of the project limits and St. Lucie fine sand with 0 to 5 percent slopes covering the majority of the site including the youth baseball fields. Both soil classes can be co nsidered well drained and have high hydraulic conductivities, with St. Lucie slightly more favorable. For hydrological purposes and SCS modeling, the hydrologic soil group of pomello fine sand is C and St. Lucie fine sand is A. The site soil can be conside red suitable for the proposed development using shallow foundations not exceeding 2,500 psf for a given footing ( See Appendix A ). 6 .2 Sub Surface Soil Conditions Based on SPT borings and hand auger borings taken in various locations, there is relatively consistent subsurface conditions across the site. It can be noted that some auger borings showed orangey clay within a 1.5 foot depth of soil which was most likely fill material from an earlier time similar to that used in baseball fields. The borings sugg est the groundwater table to be 4 to 5 feet in depth. Hence, excavations or utility installments requiring being 4 feet or more in depth may require temporary dewatering. Based on borings and published information, the seasonal high water elevation is betw een 2.5 feet and 3.5 feet in below the ground surface varying throughout the site. For conservative stormwater analysis, the seasonal high water elevation will be considered 2.5 feet below existing surface elevations or an average elevation of 148.5 ft NAV D. Additionally, double ring infiltration tests reveal an infiltration rate of 47.2 inches per hour for the southeast quadrant and 26.5 inches per hour for the nort heast quadrant of the site. 7 .0 Stormwater / Drainage Plan Pre and post development drai nage analysis of the site demonstrates that approximately a 3.8 acre wet retention pond is needed to attenuate the existing discharge rate and to mitigate for disruptions in stormwater quality (See Appendix B ) The assumptions and requirements for the desi gn and analysis of the proposed drainage system are included below in this section.

PAGE 22

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 18 of 28 7 1 Rainfall Depths The rainfall depths used in the analysis were obtained using SWFWMD ERP Rainfall Maps and are 7.0 inches and 9.0 inches for the 25yr/24hr and 100yr /24hr rainfall events ( See Appendix B ). 7 2 Rainfall Distribution For ICPR modeling, an SCS Type II (Florida Modified Flmod) rainfall distribution and a 256 shape factor was used for pre and post development conditions. 7 3 Design Requirements The f ollowing requirements for SWFWMD and Polk County regulations have been achieved during drainage design. 7 4 Water Quantity The post development 25yr/24hr discharge rate into the existing Coleman Road ditch outfall should not exceed the pre development di scharge rate per SWFWMD and Polk County regulations. In addition, the post development 100yr/24hr discharge rate into the existing Coleman Road ditch outfall should not exceed the pre development discharge rate per Polk County regulations. 7 5 Water Quali ty The treatment volume shall be one inch (1'') over the entire basin and shall be discharged in no less than 120 hours with no more than one half the total volume being discharged within the first 60 hours per SWFWMD regulations. In addition per SWFWMD r egulations (Chapter 5, Page 1), a manmade wet detention system shall include a minimum of 35 percent littoral zone, concentrated at the outfall, for biological assimilation of pollutants. The percentage of littoral zone is based on the ratio of vegetated l ittoral zone to the surface area of the pond at the control elevation. The littoral zone shall be no deeper than 3.5 feet below the design overflow elevation. The treatment volume should not cause the pond level to rise more than 18 inches above the contro l elevation. The required treatment volume for the site is 1.96 ac ft. See Appendix B for treatment calculations.

PAGE 23

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 19 of 28 7 6 Pre Development Drainage Conditions The project site was delineated into one (1) onsite basin which contains off site contributing are as as shown in Appendix B The onsite basin covers 20.24 acres and the offsite contributing area covers 3.33 acres. The onsite parking lot has no evidence of any catch basins or stormwater collection systems and thus sheet flows into undeveloped land tha t drains into the Coleman Road ditch. There is also an onsite swale that runs along the northeastern side of the property that helps to convey runoff and it drains into the Coleman Road ditch. The pre development ICPR model was setup to show one basin (t he sum of on site and off site basins) discharging to the existing Coleman Road ditch. A curve number of 57.6 was used for the pre development model (See Appendix B ). A time of concentration of 82 minutes was calculated using a combination of Manning's kin ematics solution, shallow concentrated flow and ditch flow (See Appendix B ). The re port of the pre development ICPR model can be seen in Appendix B 7 7 Post Development Drainage Conditions The proposed site has been delineated into three sub basin s usi ng the proposed grading within the project area while the off basin areas will maintain the same topography. The Runoff Curve Number s for these sub basins are shown in Appendix B The proposed wet detention pond was designed to treat and attenuate stormwat er runoff produced by the post development basins. The proposed wet detention pond has a bottom elevation of six feet below the average s easonal high water table (142.5 ft NAVD ). The proposed littoral shelf elevation is 1.5 feet below the seasonal high w ater table (147 ft NAVD ). In addition, the design top of berm is at 152.5 ft NAVD The outfall structure is located at the northeast quad rant of the pond and contains a 3.5" diameter orifi ce at an elevation of 148.5 ft NAVD which allow s no more than one half of the required treatment volume to be discharged within 60 hours following a rainfall event (See Drawdown Calculations in Appendix B ) From the treatment calculation in Appendix B the elevation of the weir slot is 149.15 ft NAVD The proposed span o f the weir slot is 9 inches and rises to the top The weir allows for water to be discharged at a significantly lower rate than in pre development

PAGE 24

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 20 of 28 conditions. Additionally, the emergency overflow is 37 by 24 inches per FDOT standards and is set at 151.5 ft NAVD (See Appendix B for drainage details and the ICPR post development report). Furthermore, the outfall structure will contain a re enforced concrete pipe that will discharge into the Coleman Road ditch. The bottom of the structure shall be filled wi th standard grouting material so that the upstream flow line is at 148.5 ft NAVD (See Appendix B ). A Right of Way permit will be required for grading into the off site ditch to ensure a point discharge is avoided. 8 .0 Utilities All utilities inside Ospr ey Village will be located underground in order to provide the residents with an unobstructed view of the entire development. The following section includes utility service availability and service providers. 8 .1 Utility Service Availability Water and sanitary services will be provided by the Polk County Water Services Group of the Environmental Resources Department. The Polk County Utility Map of the site in question reveals two sewer mains adjoining the area. There is a pressurized sewer main th at runs along the perimeter of the site, starting at the southeastern corner, running north south, and continuing east west along the southern perimeter. The main continues off the site to an unknown destination. This pipe is 6 inches in diameter al ong the eastern edge, and has an 8 inch diameter along the southern edge. The utility map shows that the site also has six reclaimed control valves. These are located along the pressurized sewer main at fairly constant intervals. This main also has t wo sewer fittings, one on the eastern edge and another at the southeast corner. In addition, the map reveals a gravity sewer main near the area. This main runs north south along on the eastern perimeter of the additional 10 acre lot and continues on t o serve the neighborhood that surrounds the site. This main is 10 inches in diameter. At the northeastern corner of the property, the main has a branch that proceeds east west for approximately 300 feet into the site. This branch is 6 inches in diame ter with a sewer manhole at the branch off location and at the end. There is also a sewer manhole at the northeast corner of the site on the primary main. A 6 inch water main runs along the southern border of Coleman Road R.O.W., this line will

PAGE 25

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 21 of 28 pr ovide potable water to the site. There is an existing 6 inch well that will be used to provide irrigation water for the site. Refer to Appendix A for the utility map of the area. 8 2 Utility Providers Gas : ( Current onsite availability unknown ) Age ncy : Central Florida Gas Address: P. O. Box 3193 Orlando, Florida 32802 Phone: ( 407 ) 423 9018 Electric : ( Available onsite currently ) Agency : Progress Energy Address: PO Box 33199 St Petersburg, Florida 33733 Phone: 800 700 8744 Telephone: ( Cu rrent onsite availability unknown ) Agency: Verizon Communications Address: 140 West Street New York, NY 10007 Phone: 800 483 3000 Cable: ( Current onsite availability unknown ) Agency : Brighthouse Central Florida Address: 3767 All American Blvd. O rlando, FL 32810 Phone: ( 407 ) 291 2500 Water ( Available onsite currently ) Agency : Polk County Utilities Address: 3767 1011 Kim Keene Blvd Winter Haven, Florida 33880 Phone: ( 863 ) 298 4100 9 .0 Sanitary Sewer Plan Each building will discharge int o a 6 inch gravity sewer leads that is sloped at a rate of 1 foot per hundred. Each lead will then connect to an 8 inch gravity sewer main that runs along Osprey Court. The 8 inch gravity sewer main was designed in accordance with section 22.4 of the Polk County Utilities Technical Standards and Specifications Manual for Utility System Design Construction which states that "All gravity sewers shall be constructed with hydraulic slopes sufficient to give mean velocities, when flowing full or

PAGE 26

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 22 of 28 half full, of not less than 2.0 feet per second, based on Manning's Formula. For all gravity sewers, velocities shall be determined using a value of n' of not more than 0.013." The 8 inch gravity sewer main has been designed to have a constant slope of 0.50 feet per 1 00 feet throughout the development. There are 8 standard 36 inch manholes located throughout the development. The manhole inverts were designed to meet the Polk County requirements that the outflow pipe invert be no less than 0.1 foot lower than the inve rt of the inflow pipe. See Appendix G for a site layout plan illustrating sanitary sewer. 9.1 Lift /Pump S tation Design The 8 inch gravity sewer main described above collects the sanitary flow from all components and discharges into a lift station locate d in the southwest quadrant of the development. This lift station was designed to provide sufficient capacity in the wet well for a period of 15 minutes at the Peak Hourly Flow ( See Appendix C ). The invert of the 8 inch inflow pipe is located at an eleva tion of 145.95 feet NAVD and the 6 foot diameter wet well bottom is located at an elevation of 131.95 ft. The low water elevation in the wet well is 131.95 NAVD and the high water elevation is located at an elevation of 144.95 feet NAVD. The 8 inch outfl ow pipe will rise to an elevation of 149 feet NAVD and exit the lift station. This pipe then connects to the 8 inch force main located along the southern perimeter of the development. The pump for this lift station was sized to overcome the head loss cre ated by the difference in elevation from the well bottom and the existing 8 inch force main located at elevation of 148 feet NAVD and the head loss through the pipe system as well as the 20 psi residual pressure in the 8 inch existing force main (See Appen dix C ). The pump selected is a Hydromatic S4L NON CLOG with a 10.5 inch impeller. This pump provides the required head to overcome all loses in the system ( See Appendix C ). 10 .0 Water Supply Plan In order to supply Osprey Village with potable water w e are connecting to the existing eight inch water main, which has a static pressure of 55 psi and a residual pressure of 48 psi during peak hour demand. This water main is located in the southern right of way for Coleman Road. An 8 inch PVC pipe will con nect to this pipe with a tapping sleeve. An 8 inch meter and back flow preventer is placed within the utility easement. This 8 inch line will serve as the trunk line through the site and will run along Osprey Court. All buildings will be supplied with a 6 inch PVC lead, with exception of the park restrooms which will have a 2 inch PVC lead and the lift station which will have a 1 inch PVC lead.

PAGE 27

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 23 of 28 The leads are designed to provide potable water and fire flow requirements for each building. Gate valves a re placed along the lines to allow isolation of each line during maintenance. Four fire hydrants connect to the 8 inch line and provide adequate lay length coverage to each building. The furthest fire hydrant from the connection with the existing eight i nch water main is Fire Hydrant 3, which shows a residual pressure of approximately 39.5 psi as shown in Appendix D Refer to Appendix G for a site layout plan illustrating the potable water system. 1 1 .0 Permitting Requirements 1 1 .1 Environmental Resour ce Permit ( ERP ) An Environmental Resource Permit (ERP) was completed for the SWFWMD basis of review, chapter four, to ensure that any offsite discharge generated from development will be managed The project was designed so that discharges will meet appli cable state water quality standards in accordance with the ERP basis of review, chapter five. Stormwater will be treated with on site wet detention treatment systems and shall be located no closer than 100 feet from a public water supply well. The applica tion for the ERP will include Sections A, C, and E along w ith all pertinent information as shown in Appendix E A stormwater management plan w as also completed for Polk County Natural Resources Group of the Environmental Resources Department 's basis of rev iew. The stormwater management plan also complies with Section 740 of the Polk County Land Development Code. 1 1 .2 National Pollutant Discharge Elimination System (NPDES) A Notice of Intent of use Generic Permit for Stormwater Discharge from Large or Sma ll Construction (NOI) was completed to ensure that the construction will comply with the National Pollutant Discharge Elimination System (NPDES) as shown in Appendix E This permit will govern and al low the discharge of stormwater during construction acti vities. 11.3 Stormwater Pollution Prevention Plan (SWPPP) In accordance to the NPDES and ERP permit s a Stormwater Pollution Prevention Plan was completed to ensure that stormwater discharged during construction will not pollute off site areas The plan will provide measures to eliminate/mitigate against pollution created when rainfall events occur during construction.

PAGE 28

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 24 of 28 11 4 Potable Water and Sanitary Sewer Connections In accordance to the Florida Department of Environmental Protection, a Notice of Inte nt to use the General Permit for Construction of Water Main Extensions of Potable Water System's was completed to allow for the general contractor of the Osprey Village Development Project to connect to the adjacent existing potable water system as shown i n Appendix E In accordance with the Polk County Board of County Commissioners Transportation Engineering Division, an Application for the Permitting of the Encroachment of Water Sewer and Reuse Water Related Facilities and Appurtenances was completed to allow the general contractor of the Osprey Village Development project to connect to the adjacent utilities as shown in Appendix E 11.5 S anitary Sewer System In accordance to the Florida Department of Environmental Protection, a Notification/Applicati on for Constructing a Domestic Wastewater Collection/Transmission System was completed to allow for the general contractor of the Osprey Village Development Project to construct a sanitary sewer system as shown in Appendix E 11. 6 Migratory Bird Nest Rem oval In order to allow the removal/relocation of the two onsite osprey bird nests, a migratory bird nest removal permit application has been completed for the Stat e of Florida Fish and Wildlife Conservation Commission, Division of Habitat and Species Cons ervation. The proposed measure to mitigate for the loss of h abitat for this species was to relocate the osprey nests from the stadium light p osts into the preserved wooded area in the northwest section of the site. A copy of the application is attached in Appendix E 1 1 7 Permitting Contact Information Southwest Florida Water Management District Address : 170 Century Boulevard Bartow, FL 33830 Phone : ( 863 ) 534 1448

PAGE 29

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 25 of 28 Florida Department of Environmental Protection Address : 3900 Commonwealth Boulevar d Tallahassee, Florida 32399 Phone : (850) 245 8336 State of Florida Fish and Wildlife Conservation Commission Division of Habitat and Species Conservation Address : 620 South Meridian Street, Mail Station 2A Tallahassee, Florida 32399 Phone : (850) 9 21 5990 ext. 17310 1 2 .0 Cost Analysis A preliminary cost analysis of the Osprey Village Development project was performed by Lever Engineering as shown in Appendix F The costs include site grading, paving, all utilities and excavation fees These costs do not include proposed buildings engineering, landscaping, irrigation, lighting, soft franchise, testing, dewatering, or any off site improvements This estimate is only an engineer's opinion of probable costs. This estimate was based on average industr y costs and does not include any potential construction conflicts. The actual construction costs may vary from this engineer's estimate of costs. Total costs of the project are estimated at approximately $ 3,2 00,000. 13.0 Low Impact Development For the Osprey Village Development, Lever Engineering is recommending that the County opt to develop the site utilizing Low Impact Development (LID). LID is a comprehensive land planning and engineering design approach with a goal of preserving and mimicking the pre development hydrologic cycle of the developing area. The recommendations included herein are accompanied with function, related benefits, and estimated costs associated with implementation. 13.1 Benefits of Low Impact Development Should the County opt to follow the recommendations as put forth by Lever Engineering regarding Low Impact Development, Osprey Village will have numerous advantages over traditional developments. Economically, the County will see only a slight increase in initial budget ( discussed further in Section 13.5). This additional cost will be offset over time

PAGE 30

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 26 of 28 by the reduced use of irrigation, fertilizer, and the reduced demand on stormwater management systems. Publically, Osprey Village will receive widespread support from the citizens of Jan Phyl Village and Polk County as a whole. Osprey Village will be constructed on land that is currently used as a county park, and thus public acceptance of the project will be somewhat difficult to obtain. According to a study performed b y Yale University, University of Miami, and Columbia University, 56% of Floridians feel that their mayors should be doing more to address global warming (66% feel that state legislators should better address the issue). The results of this study indicate that Floridians are concerned with the effects development has on the natural environment and would support actions taken to combat these adverse effects. The County's efforts to utilize LID technologies would be applauded by its citizens. In addition to the aforementioned economic and public benefits, Osprey Village, if constructed using the LID practices named below, will be infinitely more aesthetically pleasing. Trees and native vegetation will add to the ambience of the site and will attract the pub lic. 13.2 Bioretention and Rain Gardens Bioretention areas (commonly referred to as rain gardens) are a fundamental part of Low Impact Development technologies. These garden areas are filled with low growing native plants (to eliminate the need for fer tilizer) in a small depression and promote increased water retention through the root system. Each garden is designed to absorb runoff from impervious areas, such as building rooftops and impervious pavement. Often, gutters, French drains, or graded slop es are designed to divert runoff into the rain garden. For Osprey Village, Lever Engineering recommends that runoff be directed to these gardens via graded slopes. This will limit additional costs of French drain or piping systems. To maximize the eff ect of a rain garden, its shape must be longer than it is wide and its placement must be perpendicular to the slope of the area draining into it. For even greater maximum effect, each rain garden should be approximately 20% the size of the area draining i nto it. Refer to Appendix H for a list of recommended shrub species and ground covers per the Polk County Land Development Code Book

PAGE 31

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 27 of 28 Based on the above guidelines, Lever Engineering has determined that Osprey Village should include a minimum of four ( 4) rain gardens. In addition, vegetation should be planted along the entire length of the conveyance ditch that encompasses the southern portion of the site. Rain gardens and vegetation are located on the site plan provided in Appendix H The total esti mated area of vegetation on the 20 acre site is estimated to be approximately 20,000 square feet. At a cost of $12 .00 per square foot, Lever Engineering estimates the cost of all recommended rain gardens and Bioretention swales to be $ 24 0 ,000. 13.3 Perv ious Pavement It is strongly recommended that each of the four parking lots in Osprey Village be constructed with pervious pavement in an effort to reduce the demand on stormwater systems throughout the development. The use of pervious pavement is among the Best Management Practices as proposed by the Environmental Protection Agency to more adequately manage stormwater runoff. The concrete is to be used in each parking stall. Installation of porous pavement is prohibited in drive aisles and roadways to prevent the occurrence of surface raveling. Exact locations of recommended pervious pavement are shown in Appendix H A choker course must be placed directly beneath the pavement that meets AASHTO No. 57 standards. Beneath the choker course is an aggreg ate bed large enough for storage while the water percolates naturally into the soil. This bed must be filled with clean, uniformly graded coarse aggregate AASHTO No. 3. The depth of this bed generally varies from 12 36 inches. A typical cross section of a pervious lot is included in Appendix H The County can expect a cost of approximatel y $9 .00 per square yard of pervious pavement including all construction costs (aggregate bed, choker course, etc.). Based on this estimate, installing pervious pav ement over all parking stalls would cost th e County approximately $90,000. However, the initial cost of asphalt as quoted in the original cost estimate could be subtracted saving the County nearly $69,000 Additionally, the County can expect the pond si ze to decrease approximately 8% (due to less stormwater runoff resulting from the pervious pavements), saving another $12,000. 13.4 Canopy Trees Canopy trees are an integral part of Low Impact Development and are strongly recommended for Osprey Villa ge. By utilizing canopy trees to shade impervious

PAGE 32

L EVER E NGINEERING LLC. G IVE M E A P LACE TO S TAND AND I WILL M OVE THE E ARTH Polk County, FL A remark of Archimedes quoted by Pappus of Alexandria O s p rey Village Development Project Page 28 of 28 areas like roadways and buildings, the County can greatly reduce the amount of stormwater runoff produced. Canopy trees allow for the natural capture of water over a large, and otherwise impervious, area. Per Chapter 4 of the Polk County Land Development Code, a Residentially Based Mixed Use Development (RBMD) must have at least one (1) canopy tree per 75 linear feet of right of way frontage. To better incorporate Low Impact Development, Leve r Engineering recommends that Osprey Village contain one (1) canopy tree per 50 linear feet of right of way frontage. This recommendation is based on the size of the largest crown spread of acceptable tree species (50 feet) to ensure maximum coverage o f all impervious roadways in an effort to minimize both the heat island effect and stormwater runoff. In addition, each planted tree shall be native to the County to minimize fertilizer and irrigation needs. A complete list of recommended tree species and their respective dimensions per the Polk County Land Development Code is available in Appendix H To qualify as a canopy tree, a tree species must have a minimum di ameter of 2 inches at breast height and must be a minimum 10 12 feet in height at t he time of planting. The species must also be at least 2 5 feet tall and have a minimum crown spread of 15 feet at maturity per Chapter 4, Section 401 of the County's Land Development Code. Lever Engineering urges the use of Live Oak, as this tree provide s the most cover of those listed and the species thrives in Central Florida's environment. Trees of this magnitu de generally cost between $200 and $300 delivered and planted, giving a total estimated cost (based on recommendations made by Lever Engineerin g, LLC) of $7 500. 13.5 Additional Cost Analysis The costs of the initial project a re estimated at approximately $3,2 00,000 (as shown in Appendix F ). Should the County adapt the Low Impact Development recommendations as outlined in this report by Lev er Engineering, LLC, the total project cost is es timated to be approximately $3,5 00,000. This results in an additional cost of approximately $ 300 ,000 (as shown in Appendix H ). This is a cost i ncrease of only 10 % and thus making it extremely feasible f or the County to opt for Low Impact Development for the Osprey Village project.


xml version 1.0 encoding UTF-8 standalone no
record xmlns http:www.loc.govMARC21slim xmlns:xsi http:www.w3.org2001XMLSchema-instance xsi:schemaLocation http:www.loc.govstandardsmarcxmlschemaMARC21slim.xsd
leader nam 2200349Ia 4500
controlfield tag 001 002045311
005 20091218165736.0
006 m d
007 cr cn|||||||||
008 091218s2009 flua sb 000 0 eng d
datafield ind1 7 ind2 024
subfield code a G33-00005
040
FHM
c FHM
043
n-us-fl
035
(OCoLC)489769126
049
FHMM
090
HD266.F62 (ONLINE)
1 100
Risner, Allyson G.
0 245
Implementation of low impact development in modern urbanization as exampled through capstone design
h [electronic resource] /
Allyson G. Risner.
246
i Title on additional t.p.:
Final engineering details :
b Osprey Village development project
260
[Tampa, Fla. :
University of South Florida Libraries,
2009].
300
1 online resource ([3], 28 p.) :
ill.
500
Title from cover.
"Semester completed: spring 2009."
502
Thesis (Honors)--University of South Florida, 2009.
"This thesis is a continuation of my Engineering Capstone Design. ... The initial design was completed as a group (consisting of five people) under the fabricated engineering firm Lever Engineering, LLC and was completed as if it would be submitted to the County for actual approval"--Abstract.
504
Includes bibliographical references (p. [2-3] of first group).
8 586
A winning thesis in the Grace Allen Honors College/Library Scholar program.
650
Mixed-use developments
z Florida.
Sustainable urban development
Florida.
773
t Grace Allen Scholars Theses Collection.
4 856
u http://digital.lib.usf.edu/?g33.5